Skip to content

Category Strategy Example – Small Machined Parts at LHTS AB

A worked category strategy for small machined parts covering cost drivers, supplier segmentation, quality, resilience and implementation.

Small parts machining category strategy - fictive

Required pre-reading: This article assumes that you have read the LHTS AB fictitious company description. It explains the company’s products, manufacturing footprint, procurement model, stakeholders and strategic priorities. From this point, the reader is expected to understand the general LHTS AB context.

Small machined parts are often hidden inside larger products. A shaft, valve body, spacer or precision housing may represent only a small part of the product cost, but a missing or defective component can stop an assembly line or cause a product failure.

This worked example shows how LHTS AB develops a category strategy for small machined parts. It covers demand management, supplier segmentation, cost drivers, quality, capacity, sustainability and implementation. It also demonstrates why one strategy is not suitable for every machined component.

Training note: This is a fictitious LHTS AB case created for procurement training. It uses real public information about the relevant external market, combined with invented internal company data, stakeholders and supplier situations.

External data retrieved: 30 July 2026.

The LHTS AB business context

Small machined parts are used across all three LHTS divisions.

Climate and Thermal Systems uses machined shafts, valve components, adapters, bearing seats, manifolds and compressor-related components.

Power and Energy Solutions uses busbar supports, heat-sink components, electrical housings, mounting parts and precision components for power cabinets.

Automation and Lifecycle Services uses sensor housings, couplings, mounting adapters, repair components and low-volume legacy parts for the installed equipment base.

The main European demand comes from:

  • Västerås, Sweden;
  • Gothenburg, Sweden;
  • Turku, Finland;
  • Aarhus, Denmark;
  • Kassel, Germany;
  • Brno, Czech Republic;
  • Gdańsk, Poland; and
  • Milan, Italy.

Linköping also purchases prototype and development parts, but these have a different demand pattern from serial-production components.

The category is globally visible but regionally executed. Drawings and product platforms are increasingly shared, while delivery economics, machining capacity and engineering support remain strongly regional.

Category scope and baseline: where LHTS AB is today

Category definition

The category includes components produced mainly through material-removal processes such as:

  • computer numerical control turning;
  • milling;
  • drilling;
  • grinding;
  • honing;
  • broaching; and
  • selected finishing or surface-treatment operations purchased with the component.

Typical products include shafts, pins, sleeves, bushings, spacers, threaded adapters, valve bodies, manifolds, small housings, flanges and precision brackets.

The main materials are:

  • carbon and alloy steel;
  • stainless steel;
  • aluminium;
  • brass and copper alloys;
  • selected engineering plastics; and
  • small quantities of specialist alloys.

The category excludes sheet-metal fabrication, castings, forgings, standard fasteners, large welded structures and production tooling. A component may pass through one of these processes before machining, but the category strategy applies only when machining is the main source of supplier value and cost.

Fictitious internal baseline

All internal figures below are fictitious training data.

Baseline measureCurrent LHTS AB position
Annual category spendSEK 128 million
Annual purchased volumeApproximately 3.4 million parts
Active part numbers6,250
Part numbers representing 80% of spend720
Active production suppliers43
Countries of origin11
Spend with five largest suppliers57%
Spend covered by current agreements56%
Spend on single-source part numbers46%
Average on-time, in-full delivery91%
Supplier defect rate1,480 parts per million
Premium freight and urgent machiningSEK 4.6 million annually
Part numbers purchased fewer than four times per year38%
Drawings older than ten years31%

Spend by component family

Component familyAnnual spendMain applications
Precision turned partsSEK 43 millionShafts, pins, sleeves, adapters and bushings
Milled prismatic partsSEK 35 millionBrackets, housings, heat sinks and mounting components
Valve bodies and manifoldsSEK 22 millionClimate and fluid-control products
Ground and high-tolerance partsSEK 14 millionBearings, rotating systems and test equipment
Prototypes and low-volume legacy partsSEK 9 millionProduct development and aftermarket
Engineering-plastic machined partsSEK 5 millionElectrical insulation and low-friction applications
TotalSEK 128 million

Current supplier position

The supplier base has developed site by site. Several suppliers have strong relationships with local engineers and production teams. These relationships create practical value, especially during urgent changes or product launches.

However, the current structure also has weaknesses.

Sixteen suppliers each receive less than SEK 500,000 per year. Their volumes are too low to create meaningful leverage, but they still require qualification, purchase orders, performance management and master-data maintenance.

Several drawings specify tolerances, surface finishes or materials that were selected for an earlier design but are no longer challenged. Suppliers price the drawing they receive, even when the requirement creates additional machine time, inspection or scrap.

LHTS often sends individual requests for quotation without providing an annual volume picture. Suppliers therefore include uncertainty, setup cost and risk in their unit prices.

The same part may also be purchased differently between sites. One site owns the raw-material price risk, another accepts a fixed price, and a third receives an unexplained annual increase.

Demand complexity

The category contains four distinct demand types.

Demand segmentCharacteristicsCurrent challenge
Repeat production partsStable drawings and regular call-offsFragmented volumes and inconsistent terms
Complex critical partsTight tolerances, qualification and high failure impactHigh switching cost and single sourcing
Prototypes and new-product introductionLow volume, changing drawings and short lead timeSerial suppliers are often too slow
Legacy and aftermarket partsIntermittent demand and long product obligationsHigh unit cost, obsolete drawings and minimum-order quantities

The strategy must treat these segments differently. Consolidating all four with one supplier would create dependency and reduce flexibility.

The external supply market

A large and diverse industrial market

Machined parts belong to the wider European fabricated-metal and manufacturing-technology ecosystem. Eurostat reports that the manufacture of fabricated metal products was one of the largest European manufacturing divisions by employment in 2023. The broader European manufacturing sector contained close to 2.2 million enterprises and employed approximately 30.2 million people. This creates a large potential supply base, but capabilities vary considerably by process, material, tolerance, equipment and industry experience. Eurostat’s manufacturing-sector overview provides the wider context.

The existence of many metalworking companies does not mean that every part is easy to source. A supplier may be able to machine a drawing but lack suitable inspection equipment, process capability, traceability, automation or capacity for serial production.

Industrial demand has been uneven

Eurostat reported that the inflation-adjusted value of EU production in basic metals and fabricated metal products declined by 4.3% in 2024 compared with 2023. Machinery and equipment production declined by 4.7%. Eurostat’s industrial-production release indicates weaker industrial activity, but it should not be interpreted as proof that every machining supplier has spare capacity.

Capacity can remain constrained for particular machines, materials, tolerances or shift patterns. A five-axis machining centre with qualified operators is not interchangeable with a basic turning machine.

CECIMO, the European association for manufacturing technologies, described Europe’s economic recovery as fragile in June 2026 and reported that Europe’s share of world machine-tool production fell to approximately 30.8% in 2025. This indicates continuing pressure on the European manufacturing-technology base and the need to assess suppliers’ investment capability, not only their current price. CECIMO’s June 2026 market statement provides the industry view.

Labour, energy and equipment affect conversion cost

The cost of a machined component can be divided broadly into:

  • raw material;
  • machine and operator time;
  • setup and programming;
  • cutting tools and consumables;
  • inspection;
  • treatment or finishing;
  • scrap and yield loss;
  • overhead;
  • packaging and logistics; and
  • supplier margin.

Labour remains an important cost driver. Eurostat reported that hourly labour costs in EU industry increased by 3.6% year on year in the first quarter of 2026. Country-level wage changes varied significantly. Eurostat’s labour-cost release supports the use of country-specific cost analysis rather than one European inflation assumption.

Labour-cost levels also differ substantially across Europe. Eurostat estimated average hourly labour cost at €34.9 in the EU in 2025, with large differences between countries. These figures cover the whole economy and are not a machining-price benchmark, but they explain part of the regional cost difference between suppliers. Eurostat’s wages and labour-cost overview provides the comparison.

Industrial input prices remain volatile. In May 2026, EU producer prices for intermediate goods were 5.2% higher than one year earlier, while energy producer prices were 14.3% higher. These broad indices do not replace a part-specific cost model, but they demonstrate why unsupported fixed-price assumptions can be unreliable. Eurostat’s May 2026 producer-price release provides the figures.

Material prices should not control the entire part price

For a simple turned component, raw material can represent a meaningful share of cost. For a complex milled component with extensive machine time and inspection, material may be a much smaller part.

A commercial model should therefore index only the cost element affected by the material. Applying a steel or aluminium index to the full component price would also increase the supplier’s labour, overhead and margin without evidence.

The category manager needs a cost-driver model for each component family rather than one formula for all machined parts.

Quality-system requirements are changing

ISO 9001:2015 remains the published quality-management standard in July 2026, while its replacement is in the final publication stage and is expected in September 2026. Certified suppliers will receive a transition period after publication. ISO’s status page for the new ISO 9001 edition should be checked before LHTS issues final tender requirements.

LHTS should not assume that certification alone guarantees component quality. Supplier selection must also examine process capability, measurement systems, calibration, control plans, non-conformance management and change control.

Carbon and material traceability are becoming more important

The EU Carbon Border Adjustment Mechanism entered its definitive regime on 1 January 2026. It applies to selected imported goods in sectors including iron and steel and aluminium. The European Commission’s CBAM overview explains the current scope.

Not every finished machined component is automatically covered. Applicability depends on the customs classification and current legal scope. LHTS must verify the relevant commodity code and importer responsibilities rather than asking suppliers to apply a general “CBAM surcharge.”

The EU’s Ecodesign for Sustainable Products Regulation is also moving into implementation. Iron, steel and aluminium are among the priority product groups, and the Digital Product Passport is intended to improve access to sustainability, material and lifecycle information. Detailed requirements will be introduced progressively. The European Commission’s July 2026 implementation update shows the direction of travel.

This supports building stronger material and process traceability now, even where a specific machined component is not yet subject to a product-passport requirement.

Environmental management should produce evidence

ISO published ISO 14001:2026 in April 2026. The standard provides a framework for environmental-management systems and continuous improvement. ISO’s ISO 14001:2026 page provides the current edition.

For LHTS, certification can support supplier qualification, but the sourcing decision should also examine measurable performance such as:

  • metal yield and scrap rate;
  • segregation and recovery of chips;
  • energy use;
  • cutting-fluid management;
  • water use;
  • emissions information; and
  • improvement plans.

Stakeholders and business requirements

StakeholderMain interest and decision role
Product engineeringFunctional requirements, drawings, tolerances and material approval
Manufacturing engineeringMachinability, process capability and design-for-manufacture
Plant operationsDelivery continuity, responsiveness and production support
QualityQualification, control plans, capability and change approval
Supply-chain planningForecasts, lead times, inventory and call-off patterns
Service and aftermarketLong-term parts availability and low-volume continuity
SustainabilityMaterial origin, scrap recovery, energy and emissions evidence
FinanceBaseline, cost model and benefit validation
Legal and ComplianceContract terms, trade issues and supplier due diligence
ProcurementCategory strategy, sourcing, negotiation and supplier governance

Main stakeholder tensions

Engineering may consider a drawing technically correct even when it is unnecessarily expensive to manufacture.

Plants may prefer a nearby supplier that responds quickly, while the category manager sees fragmented spend and inconsistent terms.

Finance may expect immediate price savings, while quality and engineering require time and resources to qualify another source.

Aftermarket teams may need ten parts for an old product, while production suppliers prefer stable batches of thousands.

The strategy needs a governance model for these trade-offs. Procurement cannot change a tolerance or material, but it can create the commercial and analytical process that allows engineering to reconsider the requirement.

Category assessment

Kraljic portfolio position

Small machined parts do not belong in one Kraljic quadrant.

SegmentKraljic positionReason
Standard repeat partsLeverageSeveral capable suppliers and aggregatable demand
Complex product-critical partsStrategicHigh business impact, qualification effort and switching cost
Low-volume legacy partsBottleneckLow spend but limited supplier interest and urgent customer need
PrototypesBottleneck or strategic-developmentSpeed and engineering interaction matter more than unit price

This segmented assessment changes the strategy.

Leverage parts should use competition, standardisation and aggregated volumes.

Strategic parts need long-term relationships, process control, capacity planning and joint improvement.

Legacy parts need continuity solutions, not annual price auctions.

Prototype parts need speed, engineering access and clear rules for transferring a design into serial production.

Main opportunity areas

The category team identifies six opportunities:

  1. Reduce unnecessary specification complexity.
  2. Aggregate repeat demand and improve forecast visibility.
  3. Segment suppliers by capability rather than historical site relationship.
  4. Introduce transparent material and conversion-cost models.
  5. Qualify alternatives for critical single-source components.
  6. Create a dedicated model for prototypes and legacy demand.

The target position and category strategy

LHTS will create a regional European supplier network built around component segmentation, design-to-value and controlled dual sourcing.

The target is not simply to reduce 43 suppliers to the lowest possible number. It is to create enough concentration to improve leverage and collaboration while maintaining the capabilities and alternatives needed for continuity.

1. Establish four commercial component segments

Every active part number will be assigned to one of four segments:

  • repeat production;
  • complex critical;
  • prototype and new-product introduction; or
  • legacy and aftermarket.

The segment will determine the sourcing method, contract structure, inventory policy and supplier-performance model.

2. Build preferred machining capability groups

The category will use approximately:

  • six preferred suppliers for repeat turning and milling;
  • three strategic suppliers for complex and critical parts;
  • three approved rapid-response suppliers for prototypes;
  • two suppliers specialising in low-volume legacy demand; and
  • selected process specialists for grinding, specialist alloys or treatments.

A supplier may perform more than one role only when its capability and operating model support it.

The target is approximately 12–15 regularly managed suppliers, not one supplier and not an uncontrolled list of 43.

3. Standardise and redesign before tendering

A cross-functional design-to-value team will review the 250 highest-spend parts and the parts with the highest quality or delivery cost.

The review will test:

  • whether the tolerance is functionally necessary;
  • whether the surface finish is required;
  • whether a standard material can replace a specialist grade;
  • whether several parts can use the same stock dimension;
  • whether machining can be reduced through near-net-shape material;
  • whether features can be simplified;
  • whether inspection can use a common method; and
  • whether annual demand can be combined into economical batches.

Approved changes will follow LHTS engineering and quality change control. Procurement will not alter drawings independently.

4. Use a fact-based cost model

LHTS will request a structured cost breakdown for important part families.

The model will separate:

  • material weight and material price;
  • scrap and recoverable material credit;
  • setup time;
  • machine cycle time;
  • labour content;
  • tooling;
  • treatment;
  • inspection;
  • packaging;
  • logistics; and
  • margin.

Material adjustment will apply only to the agreed material share. The agreement will define the reference index, base period, review frequency, movement threshold and treatment of decreases as well as increases.

Conversion-cost adjustments will be discussed separately and supported by relevant evidence.

5. Introduce planned volume allocation

For repeat parts with at least two qualified suppliers, LHTS will normally use a planned allocation such as 70/30 or 60/40.

The main supplier receives enough volume to operate efficiently. The second source receives enough recurring demand to maintain process capability and current pricing.

The allocation can change according to quality, delivery, cost improvement and capacity performance.

LHTS will not dual-source every part. Where annual value is low or qualification cost is high, a second source may destroy value. In those cases, risk may be controlled through inventory, tooling ownership, capacity agreements or a documented recovery plan.

6. Protect critical tools, programmes and data

Contracts for critical parts will state who owns:

  • fixtures and special tooling;
  • computer numerical control programmes created specifically for LHTS;
  • gauges;
  • inspection programmes;
  • drawings and technical data;
  • approved process parameters; and
  • qualification records.

The contract will define how these items are maintained, identified and transferred if the relationship ends.

Supplier changes to material source, subcontractor, machine, production location or process must follow agreed change-control rules.

7. Create separate prototype and legacy solutions

Prototype suppliers will operate under framework agreements with:

  • agreed hourly and machine rates;
  • confidentiality and intellectual-property provisions;
  • short quotation response times;
  • rapid drawing clarification;
  • simple ordering; and
  • a documented handover to serial suppliers.

Legacy parts will use a different model. LHTS will combine demand where possible, review minimum-order quantities, digitise old drawings and consider last-time buys or redesigned alternatives.

Additive manufacturing or another process may be evaluated for selected low-volume parts, but only after technical, quality and total-cost validation. It is not an automatic replacement for machining.

8. Regionalise intelligently

LHTS will seek to source most repeat and critical parts within Europe because engineering interaction, lead time and delivery flexibility are important.

Selective sourcing outside Europe remains possible for stable, higher-volume and transport-efficient components where the total-cost and risk assessment supports it.

The comparison must include:

  • unit price;
  • qualification;
  • transport;
  • inventory;
  • duties and trade measures;
  • currency;
  • carbon and traceability requirements;
  • minimum-order quantities;
  • lead-time variation; and
  • disruption recovery.

“Local” and “low cost” are not strategies by themselves.

9. Make sustainability measurable

Preferred suppliers will provide relevant evidence on:

  • material origin and certificates;
  • recycled content where available;
  • material yield;
  • metal scrap recovery;
  • cutting-fluid control;
  • energy and emissions data;
  • environmental incidents; and
  • improvement projects.

LHTS will prefer closed-loop or high-quality recycling of metal scrap where commercially and technically practical. Environmental claims must be supported by records rather than marketing statements.

10. Establish supplier governance

Strategic suppliers will participate in quarterly business reviews.

Preferred repeat-part suppliers will receive monthly operational scorecards and semi-annual commercial reviews.

Prototype and legacy suppliers will use simpler governance focused on response time, technical support and delivery reliability.

Annual category reviews will reconsider demand, supplier capacity, cost drivers, technology, regulation and sourcing risk.

Action plan and implementation

PhaseMain activitiesAccountable ownerTiming
BaselineClean spend, supplier and part-number dataCategory ManagerMonths 0–2
SegmentationClassify parts by demand type, criticality and processProcurement and EngineeringMonths 1–3
Cost analysisBuild cost models for major component familiesProcurement and FinanceMonths 2–5
Specification reviewReview 250 priority drawings and requirementsProduct EngineeringMonths 3–9
Market engagementConduct supplier capability assessment and request informationCategory ManagerMonths 4–6
Sourcing wavesTender repeat parts by process and material familyProcurementMonths 6–11
Critical-part strategyDecide dual source, inventory or continuity treatmentCategory TeamMonths 6–12
QualificationComplete samples, capability studies and production approvalQuality and EngineeringMonths 9–16
ContractingSign framework, tooling, indexing and change-control termsProcurement and LegalMonths 10–14
TransitionPhase parts, inventory and purchase orders between suppliersPlant ProcurementMonths 12–20
Supplier developmentLaunch productivity, quality and sustainability plansCategory ManagerMonths 15–24

The transition will be completed in sourcing waves. LHTS will not move hundreds of components at the same time.

Inventory will protect the phase-in period where justified. Existing stock, open orders, qualification timing and service-part obligations will be included in each transition plan.

Measures and review

KPIDefinitionOwnerManagement purpose
On-time, in-full deliveryParts delivered complete on the confirmed dateSupply ChainProtect production continuity
Supplier defect rateRejected parts per million receivedQualityTrack process performance
Cost variance to modelActual price compared with approved cost-driver modelProcurementImprove commercial transparency
Single-source risk coverageCritical single-source spend with an approved mitigationCategory ManagerControl continuity risk
Specification improvement valueVerified benefit from approved design or requirement changesEngineering and FinanceMeasure design-to-value
Premium freight and urgent machiningAnnual cost caused by shortages or unplanned demandPlant ProcurementIdentify planning and supplier failures
Material yieldFinished-part material weight compared with input materialSupplier and SustainabilityReduce waste and cost
Supplier improvement deliveryAgreed improvement actions completed on timeCategory ManagerGovern continuous improvement

Finance will validate price reductions, cost avoidance and design-to-value benefits separately.

A unit-price reduction caused by lower material prices is not the same as a negotiated productivity saving. Avoided premium freight should only be reported when the earlier cost and the cause of improvement can be demonstrated.

What future buyers should learn from this example

  1. A broad component category must be segmented before the sourcing strategy is selected.
  2. A large number of potential suppliers does not mean that a specific part has low supply risk.
  3. Drawings and tolerances are commercial cost drivers as well as technical documents.
  4. Material indices should apply only to the cost element they actually affect.
  5. Dual sourcing creates resilience only when the second source receives enough volume to remain capable.
  6. Prototype, serial-production and legacy demand require different supplier models.
  7. Supplier reduction is a possible result of category strategy, not the strategy itself.

Conclusion

The LHTS AB small-machined-parts strategy replaces fragmented site purchasing with a segmented European supplier network.

Repeat parts use aggregated demand, competitive sourcing and transparent cost models. Complex critical parts use long-term relationships, controlled qualification and continuity planning. Prototype and legacy parts receive separate solutions suited to their demand.

The strategy also moves value creation upstream. LHTS will challenge unnecessary tolerances, improve forecast visibility, protect tooling and technical data, and measure material efficiency.

The objective is not only a lower purchase price. It is reliable access to capable machining suppliers, consistent quality, manageable total cost and a supply base that can support LHTS products throughout their lifecycle.

Sources

Category management uses Kraljic Matrix when deciding how to approach the market

Learn more about Category Management. This advanced course will help you with the first steps when implementing Category Management. The course includes a broader explanation of Category management, the content of a first version of a Category strategy and key finding (checklists).

Hope you have found inspirations to your Category Strategy for Small Machined Parts.

Small parts machining category strategy - fictive
Small parts machining category strategy – fictive

Leave a Reply